Our Termite Control Maintenance Ideas

Not known Details About Termite Control Liquid Or Bait Termite Control Maintenance for Beginners

Fascination About Termite Control Machine


With a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building that do not find the bait stations. Your house is a much bigger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring lands. .

The Sentricon baits are put in their in-ground bait stations after removal of the termite infested lumber therein. This will involve sufficient disruption of the termites such that they prevent the in-ground Sentricon bait station, entirely.

This severe short-coming is overcome by the patented Exterra Termite Stations where the timber is aligned around the cylinder like the lure can be inserted without such disturbance of the termites present.

RECOMMENDATION: Exterra or Sentricon be utilized where a comprehensive chemical soil barrier treatment using Termidor or Premise is not practicable or desired, and where a few thousand termites will likely eat the bait.

The Definitive Guide to Termite Control Liquid Or Bait


A termite monitoring and baiting program can be integrated with a range of methods including (1) drilling vulnerable trees and eradication of any termite nest situated therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is usually connected with a readily available timber food and moisture supply nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry from the ground to the structural timbers of the building. Listed below are a few useful recommendations for the house owner to execute in order to reduce the possibility of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of the building and sub-floor area (if any). Water run-off can be excluded in the sub floor area by the installation of ag-drains. Make sure there's sufficient cross flow ventilation in the sub floor area. In addition, a qualified plumber ought to be engaged to ensure there's no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit overflow.

Not known Facts About Termite Control Machine


Please note: high humidity, dampness or moisture accumulating in a wall cavity is obviously high risk to encouraging large scale termite activity inside the building. .

Elimination of any timber in contact with the soil. Timbers should be kept above ground to allow full inspection of subterranean termite activity (coming out of the ground thereunder). Any landscaping using timber chip mulch and railway sleepers must definitely be eliminated, as they provide prepared food source to assist in rapid termite colony development. .

Ensure pop over to this site inspection access is unimpeded, especially in sub-floor regions (suspended floors) in order to search for evidence of termite Discover More Here activity. If your house is on a concrete slab on ground flooring, make certain that you can inspect the entire external slab edge for evidence of termite mud-shelter tubes. Do NOT allow this region to be covered by pavers, landscaping, planter pots, etcas termites often gain entry into the walls of a building through this locality, particularly through external weep holes and minute (2 mm) gaps in the mortar in brick-work. .

The Ultimate Guide To Termite Control Liquid Or Bait


If you find live termites or termite damaged timbers DO NOT disturb the area. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites are likely to move elsewhere, and may not be rediscovered until further obvious damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait right to the live termites present in an effort to eliminate the entire termite colony - as discussed in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for routine competent inspections - at least 3 to 6 months where the termite risk is elevated.

The Ultimate Guide To Termite Control MachineHow Termite Control Machine can Save You Time, Stress, and Money.
We recommend 3 or 6 monthly inspections be carried for the initial two years after a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of destructive termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires professional ability and judgement based upon professional training and extensive field-work experience in termite control in a vast array of circumstances.

Fascination About Termite Control Machine


Termites, also known as white ants, are little soft bodied insects about half of the size of a match-head. It's projected that they cause more damage to houses in Australia than from flood, fire and storms combined. The damage is so great that termite damage is not covered by insurance meaning that its an issue you need to keep on top of Termite Pest Control.

Leave a Reply

Your email address will not be published. Required fields are marked *